← Lab · Chapter: Constructive heuristics
List scheduling and LPT¶
The Gantt chart is built job by job; next to it the bound max{max t_j, ⌈Σ t_j / m⌉} and the optimum. ◀ ▶ one step at a time, «Run» to watch them all (choose the speed); the «Instance» menu and «Edit…» change the instance.