Full index¶
All the pages of the website, in the order of the menu: the chapters with their sections and the other pages.
Graphs¶
Trees and paths¶
Flows¶
- 4. Network flow models · Exercises
- 4.1 Networks and flows
- 4.2 The minimum cost flow model
- 4.3 Feasibility conditions
- 4.4 Removing the lower bounds
- 4.5 Unbalanced instances
- 4.6 Total unimodularity and integrality
- 4.7 The dual model and the reduced costs
- 4.8 Special cases
- 4.9 A transshipment instance
- 4.10 Typical mistakes
- 4.11 In summary
- 5. Maximum flow · Exercises
- 6. Minimum cost flow · Exercises
- 7. Transportation and assignment · Exercises
Network simplex¶
- 8. The network simplex · Exercises
- 8.1 The simplex algorithm on the minimum cost flow model
- 8.2 Bases and spanning trees
- 8.3 Potentials and optimality
- 8.4 The pivot
- 8.5 The network simplex algorithm
- 8.6 An uncapacitated example
- 8.7 Degeneracy and strongly feasible trees
- 8.8 A capacitated example with a degenerate pivot
- 8.9 The initial tree: Phase 0
- 8.10 Typical mistakes
- 8.11 In summary
Project management¶
- 9. Project management · Exercises
- 9.1 Projects and project networks
- 9.2 Paths and critical paths
- 9.3 The forward pass: earliest times
- 9.4 The backward pass: latest times
- 9.5 Slacks and critical activities
- 9.6 The critical path method
- 9.7 The linear programming model
- 9.8 Two critical paths and changes of durations
- 9.9 Typical mistakes
- 9.10 In summary