N1 — Six projects and a budget
Difficulty: ★☆☆☆☆
A department chooses which projects to fund out of six. The costs are \(40\), \(25\), \(30\), \(15\), \(50\) and \(20\) thousand euros; the expected benefits are \(9\), \(5\), \(7\), \(3\), \(11\) and \(4\). The budget is \(100\). Projects \(2\) and \(5\) use the same laboratory and cannot both be funded; project \(6\) only makes sense if project \(1\) is funded too. The maximum benefit is wanted.
N2 — Three couriers, four deliveries
Difficulty: ★★☆☆☆
Four deliveries must be given to three couriers. The table gives, for every courier and every delivery, the time needed in minutes:
| delivery 1 | delivery 2 | delivery 3 | delivery 4 | |
|---|---|---|---|---|
| courier 1 | 20 | 35 | 25 | 40 |
| courier 2 | 25 | 20 | 30 | 35 |
| courier 3 | 30 | 25 | 20 | 30 |
Every delivery goes to one courier only; every courier works at most \(60\) minutes. The minimum total time is wanted.
N3 — Antennas over five districts
Difficulty: ★☆☆☆☆
A city has five districts and four possible antenna sites. Site 1 covers districts \(\{1,2\}\), site 2 covers \(\{2,3,4\}\), site 3 covers \(\{1,4,5\}\) and site 4 covers \(\{3,5\}\). Every antenna costs the same. All districts must be covered with the smallest number of antennas.
N4 — Four parcels in ten-kilo boxes
Difficulty: ★☆☆☆☆
Four parcels weigh \(6\), \(5\), \(4\) and \(3\) kilos. Every box carries at most \(10\) kilos and a parcel is not split. Three boxes are available. The minimum number of boxes is wanted.
N5 — Two products, three departments
Difficulty: ★☆☆☆☆
A workshop makes two articles. One piece of the first takes \(2\) hours in department A, \(1\) in B and \(3\) in C; one piece of the second takes \(1\), \(3\) and \(2\). The departments have \(20\), \(24\) and \(30\) hours available. The unit margins are \(7\) and \(6\) euros, and pieces are sold whole only. The maximum margin is wanted.
N6 — The shifts of the week
Difficulty: ★★★☆☆
A counter is open seven days. The clerks needed are, from Monday to Sunday, \(4\), \(3\), \(4\), \(5\), \(6\), \(5\) and \(3\). Every clerk hired works five consecutive days and then rests two; the cycle may start on any day of the week. The smallest number of clerks is wanted.
N7 — Three suppliers with a set-up charge
Difficulty: ★★☆☆☆
\(100\) units of a component are needed. Three suppliers sell it at \(9\), \(7\) and \(8\) euros a unit, but a supplier that receives an order also charges a fixed \(50\), \(120\) and \(90\) euros. The first supplier cannot exceed \(40\) units, the second \(70\), the third \(60\). The minimum spend is wanted.
N8 — Four jobs on one machine
Difficulty: ★★★★☆
Four jobs must run one after the other on a single machine. The durations are \(4\), \(2\), \(6\) and \(3\) hours; the due dates are \(8\), \(5\), \(14\) and \(10\) hours from the start. The machine starts at time \(0\) and never stops. One wants to minimise the worst tardiness, that is the maximum between zero and the difference between completion and due date.
N9 — Three warehouses and three customers
Difficulty: ★★★☆☆
Three customers ask for \(12\), \(8\) and \(15\) pallets. Three warehouses can be opened, with capacities \(20\), \(25\) and \(18\) pallets and fixed opening costs \(100\), \(90\) and \(80\). The table gives the transport cost per pallet from each warehouse to each customer:
| customer 1 | customer 2 | customer 3 | |
|---|---|---|---|
| warehouse 1 | 2 | 4 | 5 |
| warehouse 2 | 3 | 2 | 4 |
| warehouse 3 | 5 | 3 | 2 |
The minimum total cost is wanted.
N10 — Four students in two groups
Difficulty: ★★★☆☆
Four students have average marks \(28\), \(24\), \(30\) and \(23\). They must be split into two groups of two. One wants the group with the highest average and the one with the lowest average to be as close as possible.
N11 — Five films in two screens
Difficulty: ★★★☆☆
Five films last \(90\), \(120\), \(100\), \(140\) and \(110\) minutes. Two screens are free for \(240\) minutes each. Every film is shown at most once, and in one screen only. The expected takings are \(500\), \(700\), \(450\), \(800\) and \(600\) euros. Films \(2\) and \(4\) have the same audience and must not be programmed in the same screen. The maximum takings are wanted.
N12 — Diet with four foods
Difficulty: ★★★☆☆
Four foods cost \(2\), \(3\), \(1\) and \(4\) euros a kilo. One kilo of each provides
| food 1 | food 2 | food 3 | food 4 | |
|---|---|---|---|---|
| protein (g) | 20 | 35 | 10 | 40 |
| iron (mg) | 3 | 2 | 5 | 4 |
At least \(120\) grams of protein and \(25\) milligrams of iron are needed. A food, if it enters the ration, enters for at least three kilos, and never for more than ten. The minimum spend is wanted.
N13 — Purchases in brackets
Difficulty: ★★★★☆
A firm buys up to \(200\) units of a material. The price is \(10\) euros a unit for the first \(50\), \(8\) for those between \(51\) and \(120\), \(7\) beyond \(120\). The discount applies only to the units in the bracket, not to all of them. At least \(90\) units are needed, and the store holds at most \(180\). The minimum spend is wanted.
N14 — Six junctions to watch
Difficulty: ★☆☆☆☆
A road network joins six junctions with the stretches \(\{1,2\}\), \(\{1,3\}\), \(\{2,3\}\), \(\{2,4\}\), \(\{3,5\}\), \(\{4,5\}\), \(\{4,6\}\) and \(\{5,6\}\). A camera at a junction watches every stretch meeting there. All stretches must be watched with the smallest number of cameras.
N15 — Three months of production
Difficulty: ★★★★☆
A line makes one article for three months. The demands are \(100\), \(140\) and \(80\) pieces. Making a piece costs \(5\) euros; starting production in a month costs \(300\) euros whatever the quantity; holding a piece at the end of a month costs \(1\) euro. The line makes at most \(200\) pieces a month. Stock starts and ends empty. The minimum cost is wanted.
N16 — Three containers to choose from
Difficulty: ★★☆☆☆
Three containers are available: the first carries \(20\) tonnes and costs \(100\) euros, the second \(25\) tonnes and costs \(120\) euros, the third \(15\) tonnes and costs \(80\) euros; only the ones actually used are paid for. Four loads weigh \(10\), \(8\), \(12\) and \(6\) tonnes, and each must be shipped whole in a single container. Loads \(1\) and \(3\) are incompatible and do not travel together; load \(4\) requires a refrigerated container, and only the second one is. The minimum cost is wanted.
N17 — Six activities and two crews
Difficulty: ★★★☆☆
Six activities last \(3\), \(2\), \(4\), \(1\), \(5\) and \(2\) days. Two crews work in parallel, and an activity occupies a single crew for its whole duration, without interruption. Every crew carries out its activities one after the other. One wants to finish as early as possible.
N18 — Two emergency crews
Difficulty: ★★★☆☆
Two crews must be formed out of four technicians. Every technician has one of three skills: technicians \(1\) and \(2\) have the first, technician \(3\) the second, technician \(4\) the third. Every crew has two technicians and must have two different skills. Every technician is in one crew only. Technicians \(1\) and \(3\) do not work together. One wants to know whether a formation exists.
N19 — Three periods with backlog
Difficulty: ★★★★★
The demands of three periods are \(50\), \(70\) and \(40\) units. Production costs \(4\) euros a unit and does not exceed \(60\) units per period. Holding a unit at the end of a period costs \(1\) euro; delivering a unit late costs \(3\) euros per period of delay. Everything must be delivered by the end of the third period. The minimum cost is wanted.
N20 — Five pictures on two walls
Difficulty: ★★★☆☆
Five pictures are \(60\), \(45\), \(80\), \(50\) and \(70\) centimetres wide. Two walls are \(180\) centimetres long each. Every picture must be hung, and on one wall only. One wants the free space on the two walls to be as equal as possible.
Twenty symbolic problems
Data declared with their type and unit, as in the problems of the families. Every problem brings two or three links between variables into play, and the model has to be written in general, with the quantifiers.
S1 — Projects with a budget, exclusions and a portfolio bonus
Difficulty: ★★★☆☆
A body must choose which projects to fund among \(n \in \mathbb{Z}_{\ge 1}\) candidates. For every project \(j \in \{1, 2, \dots, n\}\), the value \(c_j \in \mathbb{Q}_{>0}\) is the cost, in euros, and \(p_j \in \mathbb{Q}_{>0}\) is the expected return, in euros. The budget is \(b \in \mathbb{Q}_{>0}\) euros. The set \(E\) contains the pairs \(\{i, j\}\) of projects that use the same laboratory and cannot both be funded; the set \(D\) contains the ordered pairs \((i, j)\) such that funding \(i\) forces funding \(j\) as well. A subset \(S \subseteq \{1, 2, \dots, n\}\) gathers the strategic projects: if at least \(\ell \in \mathbb{Z}_{\ge 1}\) of them are funded, the body receives an extra contribution of \(\bar r \in \mathbb{Q}_{>0}\) euros, once only. The body wants to decide which projects to fund, at maximum total return.
S2 — Tasks and resources to activate
Difficulty: ★★★★☆
A department must give \(n \in \mathbb{Z}_{\ge 1}\) tasks to \(m \in \mathbb{Z}_{\ge 1}\) resources. For every resource \(i \in \{1, 2, \dots, m\}\) and every task \(j \in \{1, 2, \dots, n\}\), the value \(c_{ij} \in \mathbb{Q}_{>0}\) is the cost, in euros, of giving task \(j\) to resource \(i\), and \(t_{ij} \in \mathbb{Q}_{>0}\) is the time that task takes on that resource, in hours. For every resource \(i\), the value \(b_i \in \mathbb{Q}_{>0}\) is the time available, in hours; \(f_i \in \mathbb{Q}_{>0}\) is the fixed activation cost, in euros, to be paid if the resource receives at least one task; \(\ell_i \in \mathbb{Q}_{>0}\) is the minimum load, in hours, that an activated resource must reach, with \(\ell_i \le b_i\). Every task goes to exactly one resource. The department wants to decide which resources to activate and how to distribute the tasks, at minimum total cost.
S3 — Posts with a service radius and a backup
Difficulty: ★★★★☆
An administration must cover \(m \in \mathbb{Z}_{\ge 1}\) users by opening posts in some of \(n \in \mathbb{Z}_{\ge 1}\) candidate sites. For every site \(j \in \{1, 2, \dots, n\}\), the value \(f_j \in \mathbb{Q}_{>0}\) is the opening cost, in euros, and \(u_j \in \mathbb{Z}_{\ge 1}\) is the largest number of users the post can take in charge. For every site \(j\) and every user \(i \in \{1, 2, \dots, m\}\), the value \(d_{ij} \in \mathbb{Q}_{\ge 0}\) is the distance, in kilometres; the site may serve the user only if \(d_{ij} \le r\), where \(r \in \mathbb{Q}_{>0}\) is the service radius. Every user must be taken in charge by exactly one open post. The users of a critical subset \(K\) must in addition have a second open post within the radius, even if it does not take them in charge. The administration wants to decide where to open and who takes whom in charge, at minimum total cost.
S4 — Containers of several types with incompatible goods
Difficulty: ★★★★☆
A warehouse must store \(n \in \mathbb{Z}_{\ge 1}\) objects in containers of \(k \in \mathbb{Z}_{\ge 1}\) types. For every object \(j \in \{1, 2, \dots, n\}\), the value \(w_j \in \mathbb{Q}_{>0}\) is the weight, in kilos, and \(g_j \in \{1, 2, \dots, q\}\) is the goods class, among \(q \in \mathbb{Z}_{\ge 1}\) classes. For every container type \(h \in \{1, 2, \dots, k\}\), the value \(c_h \in \mathbb{Q}_{>0}\) is the capacity, in kilos, \(e_h \in \mathbb{Q}_{>0}\) is the cost of one container of that type, in euros, and \(N_h \in \mathbb{Z}_{\ge 1}\) is the number available. The set \(F\) contains the pairs \(\{a, b\}\) of classes that cannot share a container. An object is not split. The warehouse wants to decide how many containers of each type to use and how to fill them, at minimum total cost.
S5 — Lots with set-up, capacity and a limited store
Difficulty: ★★★★☆
A firm plans the production of one article over \(n \in \mathbb{Z}_{\ge 1}\) periods. For every period \(t \in \{1, 2, \dots, n\}\), the value \(d_t \in \mathbb{Q}_{\ge 0}\) is the demand, in pieces; \(p_t \in \mathbb{Q}_{>0}\) is the cost of making one piece, in euros; \(q_t \in \mathbb{Q}_{>0}\) is the fixed set-up cost of the line, in euros, to be paid if anything is made in that period; \(c_t \in \mathbb{Q}_{>0}\) is the largest quantity that can be made in the period, in pieces; \(v_t \in \mathbb{Q}_{>0}\) is the smallest quantity made if anything is made, in pieces, with \(v_t \le c_t\). For every period \(t \in \{1, 2, \dots, n-1\}\), the value \(h_t \in \mathbb{Q}_{>0}\) is the cost of holding one piece at the end of the period, in euros; the store holds at most \(M \in \mathbb{Q}_{>0}\) pieces, in every period. The values \(r_0 \in \mathbb{Q}_{\ge 0}\) and \(r_n \in \mathbb{Q}_{\ge 0}\) are the initial stock and the one required at the end, in pieces. The firm wants to decide how much to make in every period, at minimum total cost.
S6 — \(p\) sites, capacity and the worst distance
Difficulty: ★★★★☆
A firm must serve \(m \in \mathbb{Z}_{\ge 1}\) customers by opening exactly \(p \in \mathbb{Z}_{\ge 1}\) sites among \(n \in \mathbb{Z}_{\ge 1}\) candidates, with \(p \le n\). For every customer \(c \in \{1, 2, \dots, m\}\), the value \(d_c \in \mathbb{Q}_{>0}\) is the demand, in pallets. For every site \(l \in \{1, 2, \dots, n\}\), the value \(u_l \in \mathbb{Q}_{>0}\) is the capacity, in pallets; for every site \(l\) and customer \(c\), the value \(t_{lc} \in \mathbb{Q}_{\ge 0}\) is the distance, in kilometres. Every customer is served entirely by one open site, and an open site does not exceed its capacity. A subset \(A\) of sites is already owned by the firm; among those not owned, at most \(\bar p \in \mathbb{Z}_{\ge 1}\) may be opened. The firm wants to decide where to open and who serves whom, minimising the largest distance between a customer and the site serving it.
S7 — Qualified machines and release dates
Difficulty: ★★★★★
A workshop must run \(n \in \mathbb{Z}_{\ge 1}\) jobs on \(k \in \mathbb{Z}_{\ge 1}\) machines. For every job \(j \in \{1, 2, \dots, n\}\), the value \(t_j \in \mathbb{Q}_{>0}\) is the processing time, in hours, the same on every machine; \(r_j \in \mathbb{Q}_{\ge 0}\) is the release date, that is the instant before which the job cannot start; \(Q_j \subseteq \{1, 2, \dots, k\}\) is the set of machines qualified to run it. For every machine \(i \in \{1, 2, \dots, k\}\), the value \(a_i \in \mathbb{Q}_{\ge 0}\) is the instant from which the machine is free. Every machine runs one job at a time, and a job, once started, is not interrupted. The workshop wants to decide on which machine and in which order to run the jobs, minimising the instant at which the last one finishes.
S8 — Shelves with classes and a maximum weight
Difficulty: ★★★★☆
A depot must distribute \(n \in \mathbb{Z}_{\ge 1}\) objects over \(m \in \mathbb{Z}_{\ge 1}\) shelves. The objects belong to \(q \in \mathbb{Z}_{\ge 1}\) goods classes: for every object \(j \in \{1, 2, \dots, n\}\), the value \(g_j \in \{1, 2, \dots, q\}\) is the class and \(w_j \in \mathbb{Q}_{>0}\) is the weight, in kilos. Every shelf may hold objects of at most \(s \in \mathbb{Z}_{\ge 1}\) different classes, with \(s \le q\), and carries at most \(c \in \mathbb{Q}_{>0}\) kilos. The objects of a subset \(P\) are fragile and must go on shelves that are all different. The depot wants to decide the distribution, minimising the weight of the heaviest shelf.
S9 — Cutting with several bar formats
Difficulty: ★★★★★
A workshop must obtain pieces of \(k \in \mathbb{Z}_{\ge 1}\) different lengths from bars of \(h \in \mathbb{Z}_{\ge 1}\) formats. For every format \(f \in \{1, 2, \dots, h\}\), the value \(L_f \in \mathbb{Q}_{>0}\) is the length of the bar, in metres, \(g_f \in \mathbb{Q}_{>0}\) is the cost of one bar, in euros, and \(N_f \in \mathbb{Z}_{\ge 1}\) is the number available. For every length \(i \in \{1, 2, \dots, k\}\), the value \(\ell_i \in \mathbb{Q}_{>0}\) is the length of the piece, in metres, and \(b_i \in \mathbb{Z}_{\ge 1}\) is the number of pieces required. The total waste cannot exceed a fraction \(e \in \mathbb{Q}_{>0}\), with \(e < 1\), of the total length of the bars used. The workshop wants to decide how many bars of each format to use and how to cut them, at minimum total cost.
S10 — Network with a fixed charge per arc and a limit on arcs
Difficulty: ★★★★☆
A logistics operator must send \(Q \in \mathbb{Q}_{>0}\) units of goods from an origin node \(s\) to a destination node \(u\) over a directed network of nodes \(V\) and arcs \(A \subseteq V \times V\); the nodes other than \(s\) and \(u\) are transit nodes. For every arc \((i, j) \in A\), the value \(c_{ij} \in \mathbb{Q}_{>0}\) is the cost of sending one unit, in euros; \(f_{ij} \in \mathbb{Q}_{>0}\) is the fixed activation cost, in euros; \(k_{ij} \in \mathbb{Q}_{>0}\) is the capacity, in units. The activated arcs cannot be more than \(\bar a \in \mathbb{Z}_{\ge 1}\), and out of every transit node at most one activated arc may leave. The operator wants to decide which arcs to activate and how much to send on them, at minimum total cost.
S11 — Cyclic shifts with rest and skills
Difficulty: ★★★★★
A service runs over \(n \in \mathbb{Z}_{\ge 1}\) days, on a weekly cycle. The staff is divided into \(q \in \mathbb{Z}_{\ge 1}\) skills. For every day \(t \in \{1, 2, \dots, n\}\) and every skill \(c \in \{1, 2, \dots, q\}\), the value \(b_{tc} \in \mathbb{Z}_{\ge 0}\) is the number of people of that skill who must be on duty that day. For every skill \(c\), the value \(w_c \in \mathbb{Q}_{>0}\) is the weekly cost of one person, in euros, and \(m_c \in \mathbb{Z}_{\ge 0}\) is the number of people of that skill already hired. Whoever works is on duty \(\ell \in \mathbb{Z}_{\ge 1}\) consecutive days and then rests \(g \in \mathbb{Z}_{\ge 1}\), and the cycle may start on any day. The service wants to decide how many people to hire per skill and with which starting day, at minimum total cost.
S12 — Portfolio in lots with sectors
Difficulty: ★★★☆☆
An investor has a capital of \(K \in \mathbb{Q}_{>0}\) euros and chooses among \(n \in \mathbb{Z}_{\ge 1}\) funds, divided into \(k \in \mathbb{Z}_{\ge 1}\) sectors. For every fund \(j \in \{1, 2, \dots, n\}\), the value \(s_j \in \{1, 2, \dots, k\}\) is the sector, \(q_j \in \mathbb{Q}_{>0}\) is the lot size, in euros — the fund is bought in whole lots only — and \(r_j \in \mathbb{Q}_{>0}\) is the expected return per euro invested. In no sector may more than a fraction \(a \in \mathbb{Q}_{>0}\), with \(a \le 1\), of the capital be invested. At least \(p \in \mathbb{Z}_{\ge 1}\) different funds must be chosen, and a chosen fund receives at least \(v_j \in \mathbb{Z}_{\ge 1}\) lots. The investor wants to decide how many lots of each fund to buy, at maximum total return.
S13 — A ration over several days
Difficulty: ★★★★★
A canteen prepares the ration of \(n \in \mathbb{Z}_{\ge 1}\) days using \(s \in \mathbb{Z}_{\ge 1}\) foods and respecting \(r \in \mathbb{Z}_{\ge 1}\) nutritional constraints. For every food \(i \in \{1, 2, \dots, s\}\), the value \(w_i \in \mathbb{Q}_{>0}\) is the cost of one kilo, in euros; \(c_i \in \mathbb{Q}_{>0}\) is the smallest quantity, in kilos, used on a day where the food appears; \(u_i \in \mathbb{Q}_{>0}\) is the largest daily quantity, with \(c_i \le u_i\); and \(h_i \in \mathbb{Q}_{>0}\) is the cost of holding one kilo in the pantry from one day to the next, in euros. For every food \(i\) and nutrient \(j \in \{1, 2, \dots, r\}\), the value \(g_{ij} \in \mathbb{Q}_{\ge 0}\) is the amount of nutrient \(j\) in one kilo of food \(i\); for every nutrient \(j\), every day at least \(a_j \in \mathbb{Q}_{>0}\) and at most \(b_j \in \mathbb{Q}_{>0}\) are needed. Every day at least \(t \in \mathbb{Z}_{\ge 1}\) different foods must appear. The canteen wants to decide how much to buy and how much to use each day, at minimum total cost.
S14 — Sequences with sequence-dependent set-ups and due dates
Difficulty: ★★★★★
On a single machine \(n \in \mathbb{Z}_{\ge 1}\) jobs must run. For every job \(j \in \{1, 2, \dots, n\}\), the value \(t_j \in \mathbb{Q}_{>0}\) is the processing time, in hours, and \(d_j \in \mathbb{Q}_{>0}\) is the due date, that is the instant by which the job should be completed; delivering late costs \(w_j \in \mathbb{Q}_{>0}\) euros per hour of delay. For every pair of distinct jobs \(i\) and \(j\), the value \(s_{ij} \in \mathbb{Q}_{\ge 0}\) is the set-up time, in hours, needed to go from job \(i\) to job \(j\). The machine starts at time \(0\), runs one job at a time and does not stop during a job. The workshop wants to decide the order of the jobs, minimising the total cost of the delays.
S15 — Crews over several periods
Difficulty: ★★★★☆
A service company must cover \(m \in \mathbb{Z}_{\ge 1}\) zones for \(n \in \mathbb{Z}_{\ge 1}\) periods, with \(k \in \mathbb{Z}_{\ge 1}\) crews. For every crew \(j \in \{1, 2, \dots, k\}\), the value \(c_j \in \mathbb{Q}_{>0}\) is the cost of employing it for one period, in euros, and \(S_j \subseteq \{1, 2, \dots, m\}\) is the set of zones it can cover. In every period every zone must be covered by at least one employed crew, and a crew employed in a period covers all and only the zones of \(S_j\). A crew cannot be employed for more than \(\ell \in \mathbb{Z}_{\ge 1}\) periods out of \(n\), and if it is employed it is employed for at least \(v \in \mathbb{Z}_{\ge 1}\) periods, with \(v \le \ell\). The company wants to decide which crews to employ and in which periods, at minimum total cost.
S16 — Students and supervisors with balanced loads
Difficulty: ★★★★☆
A degree programme must assign \(n \in \mathbb{Z}_{\ge 1}\) students to \(m \in \mathbb{Z}_{\ge 1}\) supervisors. For every student \(i \in \{1, 2, \dots, n\}\) and every supervisor \(j \in \{1, 2, \dots, m\}\), the value \(v_{ij} \in \mathbb{Z}_{\ge 0}\) is the preference score the student gives that supervisor. For every supervisor \(j\), the value \(u_j \in \mathbb{Z}_{\ge 1}\) is the largest number of students they can follow. Every student is assigned to exactly one supervisor, and nobody may receive a supervisor to whom they gave a score below \(\bar v \in \mathbb{Z}_{\ge 0}\). The programme wants to decide the assignment maximising the sum of the preferences, with the constraint that the difference between the number of students of the busiest supervisor and that of the least busy among those with at least one student does not exceed \(g \in \mathbb{Z}_{\ge 0}\).
S17 — Maintenance with windows and lost production
Difficulty: ★★★★★
A plant has \(n \in \mathbb{Z}_{\ge 1}\) machines and plans the maintenance over \(T \in \mathbb{Z}_{\ge 1}\) periods. For every machine \(j \in \{1, 2, \dots, n\}\), the values \(a_j \in \{1, 2, \dots, T\}\) and \(b_j \in \{1, 2, \dots, T\}\), with \(a_j \le b_j\), delimit the window in which the maintenance must be done, once only; \(p_j \in \mathbb{Q}_{>0}\) is the hourly output of the machine, in pieces; \(\ell_j \in \mathbb{Z}_{\ge 1}\) is the duration of the maintenance, in consecutive periods. For every machine \(j\) and period \(t\), the value \(c_{jt} \in \mathbb{Q}_{>0}\) is the cost of the maintenance crew, in euros, if the maintenance starts in that period. In no period may more than \(k \in \mathbb{Z}_{\ge 1}\) machines be stopped, and the total lost output cannot exceed \(M \in \mathbb{Q}_{>0}\) pieces. The plant wants to decide when to stop each machine, at minimum total cost.
S18 — Balanced partition of a graph
Difficulty: ★★★★☆
An organisation must split into two teams the \(n \in \mathbb{Z}_{\ge 1}\) nodes of an undirected graph with edge set \(E\). For every node \(i \in \{1, 2, \dots, n\}\), the value \(w_i \in \mathbb{Q}_{>0}\) is the workload it carries; for every edge \(\{i, j\} \in E\), the value \(u_{ij} \in \mathbb{Q}_{>0}\) is the intensity of the exchange between the two nodes. The total load of each team must lie between \(L \in \mathbb{Q}_{>0}\) and \(U \in \mathbb{Q}_{>0}\), with \(L \le U\). Some pairs of nodes, gathered in the set \(P\), must end up in the same team; others, gathered in \(F\), in different teams. The organisation wants to decide the split, minimising the total intensity of the exchanges between the two teams.
S19 — Loading with heterogeneous vehicles
Difficulty: ★★★★☆
A carrier must ship \(n \in \mathbb{Z}_{\ge 1}\) loads with \(m \in \mathbb{Z}_{\ge 1}\) vehicles. For every load \(j \in \{1, 2, \dots, n\}\), the value \(w_j \in \mathbb{Q}_{>0}\) is the weight, in kilos, \(o_j \in \mathbb{Q}_{>0}\) is the volume, in cubic metres, and \(V_j \subseteq \{1, 2, \dots, m\}\) is the set of vehicles it may go on. For every vehicle \(i \in \{1, 2, \dots, m\}\), the value \(c_i \in \mathbb{Q}_{>0}\) is the payload, in kilos, \(s_i \in \mathbb{Q}_{>0}\) is the volume available, in cubic metres, and \(f_i \in \mathbb{Q}_{>0}\) is the cost of using it, in euros. The set \(E\) contains the pairs \(\{a, b\}\) of loads that cannot travel on the same vehicle. Every load goes on exactly one vehicle. The carrier wants to decide which vehicles to use and how to split the loads, at minimum total cost.
S20 — Capacity to install with bracketed costs
Difficulty: ★★★★★
An operator must install a total capacity of at least \(Q \in \mathbb{Q}_{>0}\) megawatts choosing among \(n \in \mathbb{Z}_{\ge 1}\) technologies. For every technology \(j \in \{1, 2, \dots, n\}\), the value \(k_j \in \mathbb{Q}_{>0}\) is the capacity of one installed unit, in megawatts, and the units are installed in whole numbers; the unit cost falls in brackets: for every bracket \(h \in \{1, 2, \dots, m_j\}\), with \(m_j \in \mathbb{Z}_{\ge 1}\), the value \(u_{jh} \in \mathbb{Z}_{\ge 1}\) is the number of units in the bracket and \(c_{jh} \in \mathbb{Q}_{>0}\) is the cost of one unit in that bracket, with \(c_{j1} > c_{j2} > \cdots > c_{jm_j}\); a bracket is used only once the previous ones are full. At most \(p \in \mathbb{Z}_{\ge 1}\) different technologies may be used, and a technology that is used is installed for at least \(v_j \in \mathbb{Z}_{\ge 1}\) units. The operator wants to decide how much of each technology to install, at minimum total cost.