← Lab · Chapter: 4. Constructive heuristics
Bin packing and scheduling
Next Fit, First Fit, Best Fit and First Fit Decreasing fill the bins, List scheduling and LPT assign the jobs to the machines: step by step, with the lower bound next to the solution and the optimum at the end. Choose the rule; ◀ ▶ one step at a time, “Run” to see them all.